You are here: Technologies > Distillation > Modular Design

Modular Design

APV Modular Design

Advantages of Modular Systems

  • Lead time; standard systems can be shipped in 24 - 28 weeks
  • Cost; modular systems can save the customer as much as 20% of the project cost when compared with field fabricated systems
  • Resources; reduces a customer’s engineering and construction resources on the job site and during the design phase
  • Multiple modules for larger systems does not affect the overall time frame for the project
APV Modular Design APV Modular Design



Site Map | SPX Corporation | SPX Flow Technology